Synergy Lighting

Electrical Panel Upgrades

Panel Upgrades

The most important wire in your house is the one feeding the panel.

Your electrical panel is the single point of failure — and the single point of opportunity — for everything else in your home. An undersized or aging panel limits what you can plug in, trips for no obvious reason, and slowly degrades insurance and resale value.

Synergy specializes in residential panel upgrades across Southwest Florida, from straightforward 100-to-200-amp service swaps to full meter-main replacements with whole-home surge protection, generator interlocks and EV-ready sub-panels engineered into the same install.

Electrical Panel Upgrades
200A
Standard modern service
1 day
Typical install window
$0
Until the inspector signs
10 yr
Workmanship warranty
What's included

Three disciplines under one trusted roof.

Service Upgrades

100-amp to 200-amp or 400-amp service entrances coordinated with FPL or your utility — including new meter cans, mast and grounding electrode systems.

Code Modernization

AFCI, GFCI and whole-home surge protection brought up to current NEC standards while the panel is open and accessible.

Future-Ready Wiring

Generator interlocks, EV charger sub-panels and solar-ready breakers installed during the upgrade — so the next project is plug-and-play.

Square D QO, Eaton CH, Siemens — name-brand only.
What's Inside Matters

Square D QO, Eaton CH, Siemens — name-brand only.

Some panels you see at big-box stores are designed for the builder market and have a long history of nuisance tripping and breaker compatibility issues. Synergy installs only top-tier panels — Square D QO, Eaton CH or Siemens — sized one or two breaker positions larger than you think you need today.

We hardwire surge protection at the panel.
Surge Protection

We hardwire surge protection at the panel.

Florida is the lightning capital of North America. Every panel upgrade we install gets a Type 2 whole-home surge protector hardwired into the gear — protecting your appliances, electronics, EV charger and HVAC for the cost of one TV.

Permitted & Inspected

We pull the permit. We schedule the inspector. You sign nothing risky.

Unpermitted panel work is one of the fastest ways to void homeowners insurance and complicate a future sale. Every Synergy panel upgrade is permitted with the city or county, inspected by the AHJ, and documented in your project file.

How we work

A predictable, four-step process.

01
Step 01

Load calculation

We size the panel for what you have AND what you plan to add — EV, generator, hot tub, solar.

02
Step 02

Utility coordination

We file the permit, schedule the disconnect with the utility, and coordinate timing so power is only out for a few hours.

03
Step 03

Same-day swap

Most panel upgrades are completed in a single day, with power restored before sunset.

04
Step 04

Inspection & labeling

AHJ inspection, neat directory labels, photo documentation and your warranty paperwork.

Recent work

A few of the installs we are proud of.

200-amp Square D QO main, garage install
200-amp Square D QO main, garage install
Service-entrance upgrade with new metering
Service-entrance upgrade with new metering
Generator interlock and inlet kit during panel upgrade
Generator interlock and inlet kit during panel upgrade
Why Synergy

Built to be the contractor you call back.

Master-electrician install

Service work is performed by Florida-licensed master electricians, not unsupervised helpers.

Permit and inspection included

Filed, scheduled and passed — never on you to chase.

Same-day power restoration

We schedule disconnects strategically so your power is restored before the end of the work day.